The first phase of this new warehouse will have a footprint of 5,000 m2. The building will have a height of 13.70 metres. It is designed in such a way that it will connect two already existing SMART HUB warehouses, on each side of the building site. In addition, the warehouse is designed in such a way that it will allow further expansion towards the street side of the building. At the back, the warehouse will be directly connected to the container terminal. During unloading of a barge, the containers can be directly placed in front of a warehouse dock, without any trucking.
Follow the building of our new warehouse illustrated by below photos, which will be updated regularly. Double click to view photo in real size.
Last photo update: 19-12-2019